+86 400-623-3007
MTC · Industry Depth, Global Breadth
Solutions · Industry Solutions · Industrial Manufacturing

From shop floor to finance in one system— SAP Business One Industrial Manufacturing Solution

The SAP Business One manufacturing solution drives MRP from sales orders, controls material issue and completion reporting with BOMs plus routings, and rolls actual costs back to the operation level — material, labor and overhead traced to every production order.

Work-order cost roll-up rate
95%+
Typical MTC implementation result
Month-end close cycle
≤3 days
Down from 10+ days
Production scheduling accuracy
85%→95%
Fewer rush orders & changes

SAP Business One Gold Partner MTC · 17 years of delivery · 300+ Growing SMBs served

What keeps manufacturers up at night? Costs they can’t pin down and delivery dates they can’t commit to

Work-order costs remain opaque
Material, labor and overhead allocation relies on Excel; actual vs. standard cost variance is only discovered at month-endCost:Gross margin deviates 5–15 %; quotes lack confidence
BOM version chaos
R&D revisions and customer customizations create parallel BOM versions; the shop floor produces from outdated versionsCost:Wrong-material rework rate 3–8 %, material waste
Scheduling by gut feel
Frequent rush orders, opaque capacity bottlenecks, delivery commitments lack data backingCost:On-time delivery rate < 80 %, customer complaints
Procurement & production disconnect
MRP is not run or its suggestions are ignored; material shortages and excess inventory coexistCost:Inventory turnover 60–90 days, cash tied up
Quality traceability gaps
Incoming, in-process, and outgoing inspections scattered in paper records; root-cause analysis is slow when complaints arriveCost:Audit failures, traceability response > 48 h
Core Module · End-to-end Business Flow

End-to-end manufacturing value chain

From customer inquiry to delivery settlement, SAP Business One + MTC industry configuration covers the full chain: Order → Plan → Procure → Produce → Inspect → Deliver → Cost Roll-up.

Order & Planning
Quotation
Quotation
Sales Order
Sales Order
MRP Run
MRP Run
↓ Auto-generates purchase / production suggestions
Procurement
Purchase Request
Purch. Req.
Purchase Order
PO
Goods Receipt + IQC
Goods Receipt + IQC
Stock +
Production
Production Order
Production Order
Routing Report
Routing Report
Receipt from Production
Receipt from Prod.
Stock +
↓ Flows into inventory & cost
Delivery & Costing
Delivery
Delivery
Stock −
A/R Invoice
A/R Invoice
Cost Roll-up
Cost Roll-up
SAP Business One drives MRP from sales orders, automatically calculating what to buy, what to make, and when. Production orders control material issues and routing reports via BOM + routing. Upon receipt from production, costs are automatically rolled up to the work-order level—material, labor and overhead penetrate every work order. MTC’s manufacturing configuration also supports operation-level substitute materials and flexible BOMs.
Key control points (where the manufacturing chain most often goes wrong)BOM version lockOperation-level time captureCompletion variance auto-calculationBatch traceability
Stakeholders: Sales, Production Planning, Shop Floor, Procurement, Warehouse, QC, Finance · Modules used:ProductionInventoryPurchasing–A/PSales–A/RFinancials
Core Module · Metrics × Formula × Target

When manufacturing is managed well, these numbers move

Core MetricFormulaTarget
Work-order cost roll-up rateActual operation cost ÷ Total product cost↑ 95%+
Month-end close daysPeriod close completion date − calendar month end↓ ≤3 days
MRP adoption rateMRP suggestions executed ÷ Total suggestions × 100 %↑ 80%+
On-time delivery rateOrders delivered on time ÷ Total orders × 100 %↑ 95%+
Before → After (typical outcome comparison)
95%+
Work-order cost roll-up rate reaches 95 %+ (from "material only" to full cost penetration)
10+ days → ≤3 days
Month-end close cycle shortened from 10+ days to within 3 days
↓ 25–40 %Industry benchmark
Inventory turnover days reduced by 25–40 %
85%→95%
Production scheduling accuracy improves from 85 % to 95 %, fewer rush orders and changes

Figures above are drawn from typical results of MTC SAP Business One implementations and industry benchmarks (anonymized). Actual results depend on company size and process complexity. Items marked "Industry benchmark" are not single-client measurements.

Our approach · Manufacturing maturity ladder

From controlling materials on the shop floor to costing with clarity and delivering with confidence

Manufacturing digitalization is not a one-step leap. MTC helps manufacturers progress in three stages: first control materials and work orders, then make costs transparent, and finally get scheduling and forecasting running.

↑ Higher = leaner manufacturing
1

Materials & work orders under control (Foundation)

Doing:BOM version lock, accurate work-order material issues, real-time inventory posting—shop-floor material requests stop relying on paper slips; receipt from production instantly updates inventory and cost.
Powered by:
SAP Business One BOM ManagementProduction OrdersReal-time Inventory PostingBatch Traceability
Outcome: Accurate BOMs · Inventory book-to-physical match · Traceability in place
2

Cost transparency (Analysis)

Doing:Operation-level reporting + overhead allocation + completion variance auto-calculation—material, labor and overhead penetrate every work order; gross-margin quotes are data-backed.
Powered by:
Operation ReportingCost Center AllocationMERP Mobile ReportingMulti-dim. Cost Analysis
Outcome: Cost roll-up 95 %+ · Month-end close ≤3 days · Data-backed quotes
3

Scheduling & forecasting in action (Intelligence)

Doing:MRP-driven make-to-order, visual capacity scheduling, AI-assisted demand forecasting—delivery commitments are data-backed and rush-order impact is assessed upfront.
Powered by:
MRP RunCapacity SchedulingAI Demand ForecastingAI Scheduling Optimization
Direction: Scheduling accuracy 95 %+ · Inventory turnover shortened · Proactive delivery commitments
SAP Business One Core1+N SuiteAI Applications
3-Minute Management Health Check

Find the digital-management gaps for your industry — free, no call required.

Start the check →
FAQ

Common questions from plant managers about industrial manufacturing

We do engineer-to-order / project-based manufacturing. Standard BOMs don’t fit—what then?
SAP Business One supports a "standard BOM + order BOM" mode: each order can be modified from the standard version. MTC’s manufacturing configuration also supports operation-level substitute materials and flexible BOMs.
Shop-floor workers resist using the system for reporting—how do we solve that?
MTC provides a barcode / PDA reporting solution (MERP mobile). Workers scan a station code + product barcode to complete reporting; training takes 30 minutes.
We already have MES or equipment data collection. Can it integrate with SAP Business One?
SAP Business One offers standard APIs and DI-API. MTC has a mature MES-ERP integration middleware supporting real-time write-back of hours, output and yield data.

Get costs under control and deliveries on track

Book a 1-on-1 diagnostic with a manufacturing industry consultant to find out where digitalization delivers the biggest payback for your plant.

  • 17 years of SAP Business One manufacturing implementation experience
  • 100+ manufacturers successfully live
  • Complete closed loop from BOM to costing to scheduling
Get in touch →